Website timelines

How long does it take to build a website?

In short

A professional WordPress website typically takes 1–8 weeks to build: 1–2 weeks for a simple business site, 3–5 weeks for a custom-designed site, and 5–8 weeks for a large or e-commerce site. The deciding factor is rarely development — it’s whether your content is ready and approvals move quickly.

How long by website type?

Build time scales with complexity. These ranges assume your content is ready and you’re available for approvals along the way.

Simple business site

1–2 weeks

3–6 pages, template-based design, standard contact form and copy. The fastest path to a professional presence online.

Custom-designed site

3–5 weeks

6–15 pages with a bespoke design, custom sections, and original copywriting. The typical choice for most growing businesses.

Large or e-commerce site

5–8 weeks

15+ pages, an online store, or multiple integrations (payments, booking, CRM). More moving parts means more testing.

What affects build time?

Three factors decide where your project lands in that 1–8 week window: how ready your content is, how custom the design needs to be, and how many integrations have to be wired up. The numbers below show where time actually goes.

60%

of project delays trace back to one thing: content that isn’t ready when the build needs it.

30–40%

of total time can be cut simply by having text and images ready before the developer starts.

25–35%

of every project is content production — the single largest stage, ahead of the build itself.

5–7 days

is achievable for a simple site with express delivery — when content is ready and approvals are fast.

The five stages of a website build.

Every project moves through the same five stages. Here’s how the time divides on a typical build — and why content, not code, is the part to watch.

01Discovery & strategy

10–15% of time

Kick-off call, audience and goal mapping, sitemap and menu planning. 2–3 days for a business site; up to 1–2 weeks for a complex store.

02Design

15–25% of time

Wireframes, the design concept, and feedback rounds. A template-based design is approved in 2–3 days; a bespoke design takes 1–2 weeks.

03Build

25–35% of time

The actual build in WordPress: theme setup, page construction, mobile and responsive layout. 3–7 days of work for an experienced developer on a standard site.

04Content

25–35% of time

Copywriting, image selection, and structuring the information. The single biggest bottleneck — and the stage owners consistently underestimate.

05Test & launch

10–15% of time

SEO setup, GDPR cookies, analytics, payments, performance and security checks, then the live launch and handover. Longest stage for stores with integrations.

How our fixed process keeps it predictable.

The reason projects drift for months is almost never technical — it’s unclear scope, slow approvals, and content that arrives late. HomepageHero removes those failure points with a fixed, milestone-driven process. Most clients launch in 1–5 weeks.

  • Have content ready before the project starts — text, images, logo, brand guide. This alone cuts 1–2 weeks.
  • Choose a template-based design over fully bespoke. Saves 5–10 days in the design stage.
  • Agree to a 24-hour turnaround on approvals to keep momentum between rounds.
  • Name one internal “project owner” so internal decisions don’t stall the build.
  • Lock the scope at kick-off and push “nice to have” features to a phase two.

And because every site ships with Generative Engine Optimization built in, you launch already structured to be cited by ChatGPT, Perplexity, and Google AI Overviews — no separate phase, no extra wait.

Get a realistic timeline for your site.

Tell us what you need and we’ll send a fixed scope, a fixed price, and a launch date you can plan around — usually within one business day.

Frequently asked questions.

How long does it take to build a website?

A professional WordPress website typically takes 1–8 weeks to build, depending on complexity. A simple business site takes 1–2 weeks, a custom-designed site takes 3–5 weeks, and a large or e-commerce site takes 5–8 weeks. The timeline assumes content is ready and the client is available for approvals — content readiness is almost always the deciding factor, not development.

How long does a simple business website take?

A simple business website with 3–6 pages, a template-based design, and standard functionality takes 1–2 weeks from kick-off to launch. That assumes you have your content ready — text, logo, and images — and respond quickly to approvals. At HomepageHero we deliver this type of site in 7–10 business days once content is in hand.

What takes the most time when building a website?

Content production is the biggest bottleneck — typically 25–35% of total project time. Copywriting, image production, and structuring information stall more projects than development ever does. It is followed by the build (25–35%), design (15–25%), discovery (10–15%), and testing and launch (10–15%). The fastest projects are the ones where content is ready on day one.

Can a website be built in a week?

Yes. A simple landing page or business site with a template-based design can launch in 5–7 business days if all content is ready and you are available for fast approvals. Express delivery usually adds 20–30% for prioritized production time, but it is entirely realistic for smaller, well-prepared projects.

Why do some website projects run late?

The causes of delay are predictable: content that isn’t ready (around 60% of delays), slow client feedback (about 20%), scope changes mid-project (about 10%), and technical issues with integrations (about 10%). Very few delays are caused by the developer — the vast majority trace back to content and communication.

How does HomepageHero keep build times predictable?

We work to a fixed five-stage process with defined milestones and a 24-hour approval rhythm. Scope is locked at kick-off, content needs are flagged on day one, and every project has a single point of contact. That structure is why most clients launch in 1–5 weeks instead of watching a project drift for months.